Case study - Blast proof windows

We were asked to design and manufacture very heavy duty window fittings for blast proof windows that would be capable of resisting a 50 year exceptional weather event.

After extensive testing at the Building Research Establishment Watford we produced a design that passed some of the most rigorous testing we have ever undertaken. The products also had to be completely Tamperproof so that only authorised personnel could release them.

This development really illustrates what this company is all about. We have a "can do" approach to the two most important areas, solving design problems, and manufacturing specials to the highest standards.

Featured products View all of our products »

19rcrmitab

19mm mitred lever solid brass on rose pictured in bronze, polished brass, satin stainless steel...

READ MORE

19rcrnrlg

19mm non return lever with leather grip on rose pictured in satin stainless steel  also...

READ MORE

25R300300BTAS L Shaped pull handle

25R300300BTAS L Shaped pull handle 300 x300 Can be fitted as an L shaped pull handle or...

READ MORE

19rbt150as 19mm x 150mm pull handle

19x150mm bolt through pull handle in saa also available in paa, brass, satin stainless steel,...

READ MORE
De La Warr Pavilion, Bexhill-on-Sea, East Sussex View project »

© 2025 Dortrend International Ltd. All rights reserved.

86a Blackpole West Trading Estate, Worcester, Worcestershire WR3 8TJ

tel: +44 (0) 1299 827837 fax: +44 (0) 1299 827094 email: sales@dortrend.co.uk